LNG plant operating window now 6 years

LNG plant operating window now 6 years

after detailed RCM study and online inspection techniques.





Client: Large LNG plant (Africa).

Tough Problem: Client not sure which maintenance strategy most appropriate for "big ticket" items eg. Frame 7 gas turbines and LNG refrigeration circuits.

Practical Solution: SVT supported the client from Basis of Design (BOD); critical assets are monitored remotely in real-time and online engineering support is available 24/7 to analyse and interpret changes in the condition of all key production equipment - including gas generators, turbines, compressors and electric motors.

Once problems are identified SVT Rotating Equipment specialists carry out comprehensive Root Cause Analysis and provide practical advice specifically geared to support production targets.

SVT complement its real-time monitoring solutions with high-end services such as alignment, pulsation analysis, balancing, oil analysis, fatigue analysis, thermodynamic studies and piping vibration troubleshooting.

Bottom Line: State-of-the-art condition monitoring system for state-of-the-art platform provides world-class production reliability.